AOA (USA)
Primary Mirror Center of Curvature Alignment System (CCAS) | |
BKS ADVANTECH (South Africa)
Supplier of the telescope structure and dome and mirror truss. | |
CP DE LEEUW (South Africa)
Quantity surveyors | |
DATASMITH (South Africa)
Supplier of Great Plains, the financial management system | |
EOS TECHNOLOGIES (USA)
Supplier of the primary mirror mounts | |
E2V TECHNOLOGIES (UK)
SALTICAM CCD Detectors | |
ITT (USA)
Shaping and final figuring of the primary mirror blanks | |
FOGALE NANOTECH (France)
Primary Mirror Segment Alignment System (SAMS) | |
GROENEWALD PRELLER ARCHITECTS (South Africa)
Architects for the facility and utility buildings | |
G. JOHARDIEN & ASSOCIATES (South Africa)
Electrical consulting engineers. | |
LZOS (Russia)
Supplier of the primary mirror blanks | |
NEWLANDS ELECTRICAL (South Africa)
Electrical installation contractor | |
NINHAM SHAND CONSULTING ENGINEERS (South Africa)
Consulting engineers for the design and construction of the facility and utility buildings | |
PHYSIK INSTRUMENTE (Germany)
Primary Mirror Segment Positioning System (SPS) | |
REUTECH RADAR SYSTEMS (South Africa)
Supplier of the drives and controls for the telescope structure and the dome | |
SAGEM SA (France)
Supplier of the spherical aberration corrector | |
South African Astronomical Observatory (South Africa)
Built SALTICAM and the PFIS detector package | 
|
SPECIAL PRODUCTS & TECHNOLOGIES (South Africa)
Suppliers of the primary mirror vacuum coating plant | |
SYNAPP (South Africa)
Primary Mirror Alignment Control System (MACS) | |
TFD (South Africa)
Heat transfer specialists for modelling of ventilation and air-conditioning | |
WBHO CONSTRUCTION (South Africa)
Construction contractors for the facility and utility building | |
WML Construction
| |